KARASSAYDATA CENTER

KAZAKHSTAN / ALMATY REGION

A site for your next data center

Industrial land with energy infrastructure and room to expand

Today

Industrial land
2 ha
Energy foundation of the first plot
4.8 MW

Potential

Land reserve
+9 ha
Development across four plots
Up to 19.2 MW
01 / 03

2 ha industrial site and 9 ha land reserve

Zhambyl village, Karasay District, Almaty Region.

Satellite schematic showing the substation, industrial site and land reserve.
Industrial land: 2 ha. Additional land reserve: 9 ha. Boundaries shown on the schematic are approximate.
Industrial land
2 ha in private ownership. Four plots of 0.5 ha each.
Site infrastructure
A fenced site, existing structures and its own water well.
Expansion reserve
An additional 9 ha of owned land adjoining the main site. The land is currently designated for agricultural use.
Convenient access
Good access to the industrial site via an unpaved road.
Industrial use experience
The site was previously used to accommodate a mining farm.

An energy foundation for project growth

4.8 MW

Current energy base

First industrial plot.

Up to 19.2 MW

Development potential

Phased development of four industrial plots.

Phased power development

Four industrial plots of 4.8 MW each

  1. Plot 14.8 MWCurrent base
  2. Plot 24.8 MWPhase 2
  3. Plot 34.8 MWPhase 3
  4. Plot 44.8 MWPhase 4

Further expansion

The additional land reserve enables the creation of new industrial plots and growth of energy potential following conversion of the land to industrial use

+9 ha
Electrical input to the industrial site: transformer structure and overhead power line
Existing electrical input to the industrial site

Kaskelen (Zhandos) substation

Neighbouring substation
250 MVA
Distance from the site
≈100 m

A major substation with an installed capacity of 250 MVA is located next to the site.

The market is growing. Karassay is ready to scale

Global data center infrastructure is expanding, while Karassay’s power potential supports consideration of projects on a scale comparable to operating data centers in Kazakhstan

JLL RESEARCH · 2026

Almost twofold growth by 2030

Global data center capacity · GW

JLL Research · 2026 report · p. 30 ↗PDF ↗
  1. 103 GW
    2025Estimate
  2. 115 GW
    2026Forecast
  3. 200 GW
    2030Forecast

Power scale alongside Kazakhstan’s data centers

Total facility capacity and the proposed site’s power parameters — not IT load.

  1. Kazteleport · Sairam, building 2 · Almaty Operating data center · Total capacity Kazteleport · operator page · checked 21 Oct 2026 ↗

    1 MW

  2. Kazteleport · Sairam Tier III · Almaty Operating data center · Total capacity Kazteleport · operator page · checked 21 Oct 2026 ↗

    2 MW

  3. Kazteleport · Yereymentau · Astana Operating data center · Total capacity Kazteleport · operator page · checked 21 Oct 2026 ↗

    2 MW

  4. QazCloud · Kosshy Operating data center · Total electrical capacity ComNews · 2024 data ↗

    3 MW

  5. Kazakhtelecom · Almaty Operating data center · Total electrical capacity · modular data center ComNews · 2024 data ↗

    3.3 MW

  6. Kazakhtelecom · Pavlodar Operating data center · Total electrical capacity ComNews · 2024 data ↗

    4.2 MW

  7. Karassay · First plot 2023 technical specifications

    4.8 MW

  8. Karassay · Four plots Prospective potential

    Up to 19.2 MW

Data centers are shown by published total capacity, not actual consumption. Karassay is a site for future data center construction: 4.8 MW is stated in the first plot’s technical specifications; up to 19.2 MW is the four-plot potential, subject to approval of new connections.

The first plot’s power base supports consideration of a project on a scale comparable to the data centers shown. Four industrial plots provide room for phased expansion.

Open to partnership

We offer an industrial site for independent data center development or the joint delivery of an investment project

01 / For data center operators

Long-term lease

Industrial land for building and operating your own data center

02 / For investors

Joint project

Development of a computing complex with the owner potentially contributing land and infrastructure assets

Shall we discuss a partnership?

Interested in the Karassay site? Send an inquiry and we will contact you to discuss the project

Contact the project team